了解您的选择
详细了解评估内容。
Environmental contamination can present potential risks to property occupants, workers, surrounding properties, future land use, and property transactions. BNF provides Phase I and Phase II Environmental Site Assessments (ESAs) for commercial, industrial, and development properties. Phase I assessments evaluate historical property use, regulatory databases, environmental records, adjoining and surrounding properties, site reconnaissance, and other relevant information to identify recognized environmental conditions (RECs), controlled RECs, historical RECs, and other potential environmental concerns, as applicable under the assessment standard. Where warranted, Phase II investigations use soil, groundwater, soil-gas, indoor-air, surface-water, or other targeted environmental sampling and laboratory analysis to investigate potential impacts identified during the Phase I assessment. Assessments may be performed in accordance with applicable ASTM standards, EPA requirements, state environmental programs, and applicable regulatory requirements, depending on the project.

评估范围
评估可能
包含的内容。
- Federal, state, and local environmental database review
- Historical property research
- Sanborn fire insurance map review
- Historical aerial photograph review
- Historical map and city-directory research where available
- Site reconnaissance and photographic documentation
- Adjoining and surrounding property review
- Owner/operator interviews
- Environmental records review
- REC, CREC, and HREC evaluation where applicable
- Environmental Professional review and opinion where applicable
- Targeted Phase II environmental investigation where warranted
流程说明
从第一个问题
到最终报告。
- 01
范围与报价
Tell us the property address, current and historical property use, year built, transaction or development purpose, known environmental concerns, surrounding land uses, and intended use of the assessment. BNF determines the appropriate ESA scope and applicable ASTM and regulatory requirements.
- 02
BNF Environmental Site Assessment
Qualified environmental professionals conduct the appropriate historical research, regulatory database review, environmental records review, adjoining-property evaluation, interviews, and site reconnaissance to identify potential environmental concerns and applicable recognized environmental conditions.
- 03
Phase II Investigation
Where warranted, BNF develops a targeted investigation based on the Phase I findings. Sampling may include soil, groundwater, soil-gas, indoor air, surface water, or other environmental media, with laboratory analysis performed using appropriate methods.
- 04
Technical Review & Report
BNF evaluates the records, field observations, analytical results, and applicable criteria and prepares documentation consistent with the applicable ASTM standards, EPA requirements, state environmental programs, and project-specific regulatory requirements.
正在加载报告样本…
更清晰的开始
常见问答
ASTM E1527-21 为什么重要?
ASTM E1527-21 是适用于第一阶段环境场地评估的公认 ASTM 标准,EPA 认可其符合联邦 All Appropriate Inquiries 框架。
第一阶段环境场地评估需要多长时间?
周期取决于物业复杂程度、记录可获得性、现场进入条件、法规调查、访谈及所需报告范围。